Simulated workplaceCAQA Gridworks Networks is a fictional business created by CAQA for training and assessment. It is not a real company and no person, client or record here is real.About this simulation
UETCAQA GridworksSimulated workplace
Simulated workplace
Scenario · Rail Traction

Run a night possession on the 1,500 volt traction overhead

You are a Rail Traction Line Worker and possession lead in Rail Traction.

Intermediate3 to 4 hours8 tasks
Home/Scenarios/Run a night possession on the 1,500 volt traction overhead
The situation

What has happened

A night possession on the Sunshine to Deer Park up line, work order WO-26-4377, runs from 0:30 am to 4:30 am on Saturday 13 September. The work is fourteen dropper replacements, a registration arm adjustment at structure 1226 and an inspection of the section insulator at structure 1231, in overhead wiring section 34. Traction switching schedule TS-26-0187 is validated and rail traction access RTA-26-0442 is requested. Track protection is provided by the rail operator. Last month a worker climbed a structure before the access was issued, recorded as INC-2026-046, and the Rail Traction Manager wants radio confirmation of the access to every crew member before anyone touches a structure. The down line remains live and trains may run on it.

Your brief. Plan and run the possession: brief the crew with the new access confirmation rule, perform the traction switching to schedule, take the traction access, complete the maintenance and inspection safely with the live down line adjacent, test and verify the work, cancel the access and hand the section back on time with complete records.
Read the work request in your inbox
Tasks

Deliverables

  • Possession briefing and job risk assessment
  • Completed access form and access register entry with radio confirmation noted
  • Switching program register execution record for TS-26-0187
  • Work order with measurements and completion
  • Asset inspection register entry for the section insulator
For trainers and assessors

Units of competency

Current on training.gov.au for the Transmission, Distribution and Rail Sector as at 10 September 2026.

UETDRRT011Maintain traction overhead wiring systems
UETDRRT013Perform rail traction switching operations to a given schedule
UETDRRT009Maintain overhead traction components and equipment
UETDRRT014Test and verify rail traction installations
UETDRMP001Apply access authority procedures to work on or near electrical apparatus

Qualifications

UET30721Certificate III in ESI - Rail Traction
Assessor notes

What to look for

Evidence guide

Look for the possession, track protection, switching and access steps in the correct order, with the radio confirmation to every crew member recorded before climbing. The live down line must be treated as a controlled hazard. Measurements and the section insulator condition should be recorded, and the hand back should show earths removed, access cancelled and restoration switching complete within the possession window.

The student's evidence summary lists every record they created or changed in the systems named above, their notes and the tasks they ticked. Verify it against the deliverables and your own assessment tool.