Switching Program Register
Records every distribution, substation and rail traction switching program from writing through validation, direction and completion, with the writer, checker, controller and each step's confirmation.
Fields in this system
Program numbertext
Work ordertext
Network typeselect
Purpose and apparatustextarea
Writer and checkertext
Planned datedate
Statusselect (status)
Steps and execution notestextarea
Scenarios that use it
Act as access recipient for a 22 kV pole replacementCheck and validate a high voltage switching programRepair a low voltage underground cable fault and restore supplyPlan a transmission tower climbing inspection and hardware replacementPerform substation switching, inspection and a thermovision surveyRun a night possession on the 1,500 volt traction overhead